So last update was... depressing ;) But I've hit the bottom of that dip in the roller coaster that is working on Maude, and I'm back to being stubborn and we're forging ahead!
We think that a fair amount of the leaking from the windows could be coming from these corners in the frames, so we used some Tolley's Creeping Crack Cure and we'll see after the next rain if it made a difference!
I also went through and slathered more caulk on any rivets that looked like I had skimped a little. TAKE THAT LEAKS! ;)
Next, we decided that it was time to get rid of the vent that, once we start installing Maude's interior, would have been in the middle of the bathroom wall. While Mike was chiseling off the backs of the rivets holding it in place, a HUGE chunk of wasp nest fell out! I *THINK* this is the last of the yucky old stuff? LOL
Bathroom will be to the right of this vent, "hallway" back to the treatment room will be to the left.
Surely, by now you guys understand the procedure for riveting? ;) Mike made sure to be VERY generous with the caulk. Pretty sure this sucker won't leak on us ;)
And while Mike was up on the roof, I was working on these patches! They aren't patching anything, they're just to be pretty, but they sure add to the Mt. Hood silhouette!
And, finally, here's Thanksgiving in the Seitz household! Lots of yummy food with Maude the AcuTrailer projects that have been sitting on the dining table pushed aside! LOL
Until next time! <3 Becca